OPM Project Delivery Manual
This Project Delivery Manual was developed to standardize processes, consolidate forms and detail the steps involved in implementing a construction project.
The manual includes five (5) phases. Each section includes a detailed description, checklist, flowchart, and a list of forms required per stage of the project.
The checklists have been developed to support project implementation and specifically identify the responsibility for key tasks. The flow charts capture the high level major activities within each phase. In addition, all forms have been consolidated and standardized to maximize efficiency and use. The applicable forms are then provided to all A/E and general construction firms at the start of each project.
Based on the scope of the project, the project manager will determine the level of implementation necessary to facilitate a quality project.

Introduction
Chapter 1: Initiation
Chapter 2: Planning
Chapter 3: Design
Chapter 4: Construction
Chapter 5: Close Out
|